STEVEDORING RELATED TARIFF

The Stevedoring Related Tariff section is divided into the following subsections:

501 LOADING AND DISCHARGING OF CONTAINERS
502 HAZARDOUS CONTAINERS
503 CONDITIONS AND SERVIES
504 RE-STOWS
505 OTHER EQUIPMENT
506 SHIFTING OF CONTAINERS
507 TRUCK LOADING/UNLOADING CHARGE (TLUC)
508 USE OF SPECIAL EQUIPMENT
509 WEIGHING OF CONTAINERS
510 CONTAINER LOADED IN EXCESS OF RATED CAPACITY
511 CONTAINER STORAGE RATES
512 STUFFING AND UNSTUFFING AT CONTAINER FREIGHT STATION (CFS)
513 STORAGE AT CFS
514 STUFFING / UNSTUFFING VEHICLES AT CFS
515 MONITORITNG OF REFRIGERATED CONTAINERS
516 DELAYS TO CRANE
517 CANCELLATION / POSTPONEMENT OF BERTHING
518 CLEANING CONTAINERS
519 KNOCKING DOWN FLAT RACKS
520 FITTING AND REMOVING TARPAULINS
521 ADMINISTRATIVE CHARGES AND THEIR OPERATIONAL REQUIREMENTS
522 UNDELIVERED CONTAINERS - AUCTIONS / DISPOSAL
523 BUNDLING OF EMPTY FLATS / FLAT RACKS
524 CONTAINER MAINTENANCE CHARGES
525 CANCELLATION OF LABOUR
526 OPENING AND CLOSING OF HATCHES
527 TRANSHIPMENT CARGO
528 SHIFTING CARGO ONBOARD (RESTOW)
529 RIGGING DERRICKS
530 CARGO SORTING
531 LOCKER / DEEP TANKS AND CABIN CARGO
532 TIMBER - PLYWOOD
533 BAGGED CARGO
534 HEAVY LIFTS / AWKWARD LIFTS
535 DANGEROUS CARGO
536 SCRAP
537 LIVE ANIMAL
538 STEEL
539 GENERAL CARGO
540 RO-RO
541 BULK
542 REEFER
543 DISTRESSED CARGO
544 STEVEDORING RELATED TARIFF (Effective 1st May 2012)
501 LOADING/DISCHARGING OF CONTAINERS
  Up to 20’- Charges in AED Over 20’- Charges in AED
Full 413 656
Empty 255 348

Note:

The above rates are chargeable per move. Rates are inclusive of all overtime with the exception of declared public holidays. (See item 216.3)

Back to top

502  HAZARDOUS CONTAINERS
502.1
Containers loaded with hazardous Cargo will be charged an extra of 50% on the applicable THC.
Note: Above will apply on Laden Transhipments but not applicable to import LCL destined to Port CFS (except Classes 1 and 7).
502.2
Other charges and fines for hazardous Cargo violations and leaking Containers may be levied at the discretion of the Port authority. Please see Appendix 1 – Related third party Tariff for more information.

Back to top

503 CONDITIONS AND SERVICES

The above rates (Items 501) are based on the following conditions and services:

503.1
That the Vessel is constructed in a manner that permits the Port Operator to load and discharge Containers by the use of a gantry type Container crane.
503.2
That the loading or discharging is not delayed or interrupted by Cargo not ready for handling.
503.3
That reporting and documentation is in accordance with existing rules and regulations.
503.4
Restows will not count towards Volume commitments.
503.5
Transhipment Containers laden or empty count as one move only.
503.6
Direct delivery is not allowed except under special circumstances, with the prior approval of the Port Operator.
503.7
Discharging - one Container move from stowed position in Vessel to point of rest in marshalling yard.
503.8
Loading - one Container move from point of rest in marshalling yard to stowed position in Vessel.
503.9
Transhipment - one move from stowed position in Vessel to point of rest in marshalling yard OR one move from point of rest in marshalling yard to position in Vessel.
503.10
Lashing and unlashing, provided that all lashings are of the quick release type and are supplied by the Vessel and excessive under deck lashing is not required. For extra lashing of Containers or any other Cargo, charge for extra gang as per item 703.3 shall apply.
503.11
Cranage, tractors, grounding and stacking equipment and labour as required.
503.12
Free storage as per item 511 shall apply for containers handled over quay.

Back to top

504  RE-STOWS (Any Size)
Move Standard Rates (AED)
Within Hatch 145
Via Quay 240

Re-Stows will not count toward volume commitments

Back to top

505  OTHER EQUIPMENT

Pontoons, hatch covers and stacking frames will be charged at rates shown in Item 504, via the quay, but will not count towards volume commitments.

Back to top

506  SHIFTING OF CONTAINERS
  Locations Charges per 20’ - in AED Charges per 40’ - in AED
506.1 Within a Container Terminal (Includes grounding) 150 200
506.2 Container Terminal to Container Freight Station.
Note:Charges are round trip including grounding. Shifts will apply to all LCL Containers.
240 300
506.3 Container Terminal to General Cargo and all other locations outside terminal Note: This rate does not include any charge for grounding and/or move from ground to trailer that may be incurred. Grounding charge within Port operating area AED150 per unit except for Quay 10 area Jebel Ali Port where the rate will be AED 400 per Container. Other subsequent Containers will be charged at AED 150 per Container provided the job is executed at one time. 300 400
506.4 Inter Terminal Transfer (ITT): between Container Terminals at Jebel Ali. Charges inclusive of loading, offloading and trucking 150 250

Back to top

507 TRUCK LOADING/ UNLOADING CHARGE (TLUC)

Truck loading and unloading applies to all Containers, regardless of size, that are delivered and received at the Port facility Terminal gates.

Service Charges in AED
Loading 140
Unloading 140

Note: Rates are charged per Container move from point of rest in marshalling yard to the truck and vice versa.

Back to top

508 USE OF SPECIAL EQUIPMENT

The use of “emergency gear” (wires or chains) for each lift during Container handling operations will be charged at the rate of AED 600 per lift per Container in addition to the appropriate Container handling rate.

Back to top

509 WEIGHING OF CONTAINERS

Weighing Containers while entering or leaving Port Facility on transport not belonging to Port Operator and for furnishing weighbridge ticket - AED 60 per Container per ticket.

Back to top

510 CONTAINERS LOADED IN EXCESS OF RATED CAPACITY

The rates, rules, regulations and charges published in this Tariff are not applicable to standard Containers loaded in excess of their capacity. The Port Operator will not permit its Container cranes or its mechanical equipment to be used in any way to lift, move or transport a Container which is loaded in excess of the Container.s rated capacity. Should the Port Operator.s equipment or crane be used to lift, move or transport a Container which is loaded in excess of the Container.s rated capacity, the party or parties causing such unauthorized use shall be held liable for all losses, claims, demands and suits for damages, including death and personal injury, and including legal and court expenses, directly or indirectly resulting from such unauthorized use.

Containers tendered to the Port Operator with weight exceeding the Container.s rated capacity will be rejected and a fine of AED 1,200 per Container will be charged. The Port Operator may strip these overweight Containers or may return them to the Shipping Line or his Agent for their further return to the shipper. This is at the discretion of the Port Operator.

Back to top

511  CONTAINER STORAGE RATES

511.1  Import Full Containers

Import Up to 20’- Charges in AED Over 20’- Charges in AED
First 10 days FREE FREE
Next 5 days 80 160
Thereafter 150 300

Note:

  1. Above rates apply per day.
  2. For a minimum of 30 Containers imported by the consignee on a single Bill of Lading or on the same Vessel - voyage (Rotation) Free storage would be allowed for the first 14 days. Thereafter, the Tariff will apply.
  3. For a minimum of 100 Containers imported by the consignee on a single Bill of Lading or on the same Vessel - voyage (Rotation) Free storage would be allowed for the first 20 days. Thereafter, the Tariff will apply.
511.2 Export Full Containers
Export Up to 20’- Charges in AED Over 20’- Charges IN AED
First 10 days FREE FREE
Next 20 days 30 60
Next 30 days 40 80
Thereafter 80 160

Note: Above rates apply per day.

511.3 Transhipment & Empty Containers

Up to 20’- Charges in AED Over 20’- Charges in AED
First 10 days FREE FREE
Next 90 days 11 22
Thereafter 22 44

Note: Above rates apply per day.

Back to top

512 STUFFING OR UNSTUFFING AT CONTAINER FREIGHT STATION (CFS)
512.1
LCL/FCL Containers un-stuffed at Port Facility - AED 350 per TEU.
512.2
For LCL Containers un-stuffed at Port Facility, if not advised prior to Vessel‟s arrival, change of designation charge as per item 521.1a will apply in addition to unstuffing charges.

Note: The above rates do not cover shifting charge.

512.3
In addition to the above charges, goods received or delivered from Port CFS will incur a minimum Port handling charge of AED 60 per Bill of Entry. Goods handled in excess of that will be charged at a rate as mentioned below.
  Cargo Type Charges in AED per Freight Ton
a) For transhipment / export Cargo 23
b) For import Cargo 25
c) For hazardous Cargo handled in CFS 50% extra will be charged as surcharge in addition to Port handling charges
512.4
Unstuffing directly from Container to Consignee's Truck.
Up to 20’- Charges in AED Over 20’- Charges in AED
350 700
512.5
When Containers are unstuffed or stuffed at private CFS facilities, the following surcharge will apply.
Up to 20’- Charge in AED Over 20’- Charges in AED
45 80
512.6
Partial stuffing or unstuffing.
Cargo Volume (CBM) 20’- Charges in AED 40’- Charges in AED
Up to 3 CBM 135 135
Up to 10 CBM 200 200
More than 10 CBM 350 350
More than 20 CBM - 700

Note:

  1. For stuffing/unstuffing vehicles with personal effects, in the same Container, in addition to the above rates, item 514 will also apply.
  2. Administration charge for cancellation of CFS Container job AED 55 per document.
  3. Where additional equipment or labour is required, charges will be raised accordingly.
  4. In case of overweight/damaged/leaking/loose scrap Containers, additional charges will be applied for extra manpower & equipment (if used).
  5. When any operation is carried out other than in CFS area a 50% surcharge will be added on actual charges.

Back to top

513 STORAGE AT CFS
513.1 Import/Export – Covered
Period Charges in AED
First 5 days FREE
Next 10 days 4.50 per 5 days
Next 10 days 5.00 per 5 days
Thereafter 7.50 per 5 days
513.2 Import/Export – Open
Period Charges in AED
First 10 days FREE
Next 15 days 4.50 per 5 days
Next 15 days 5.00 per 5 days
Thereafter 7.50 per 5 days
513.3 Transhipment – Covered
Period Charges in AED
First 15 days FREE
Next 20 days 5.00 per 5 days
Thereafter 7.50 per 5 days
513.4 Transhipment – Open
Period Charges in AED
First 30 days FREE
Next 20 days 5.00 per 5 days
Thereafter 7.50 per 5 days

Note: LCL Cargo unstuffed from Containers handled over the Port Operator's quay receive free storage as per above.

Back to top

514 STUFFING OR UNSTUFFING VEHICLES AT CONTAINER FREIGHT STATION (CFS)
514.1
Stuffing of vehicles into Containers including normal blocking and bracing will be charged at a rate of AED 240 per vehicle. Additional lashing will be charged at cost.
514.2
Unstuffing of vehicles from Containers inclusive of unlashing unblocking will be charged at a rate of AED 240 per vehicle.
514.3
For a Container which in addition to the vehicle has other Cargo to handle, then in addition to item 514.1 or 514.2, item 512.6 will also apply.
514.4
For a Bus (more than 14 seats) in a dry Container will be charged at a rate of AED 500 (charges includes normal blocking & lashing charges).
Note: The above rates do not include the shifting charge and only apply for standard vehicles that can be shipped in closed Containers.
514.5 CFS MISCELLANEOUS SERVICES
Service Charges in AED
Container Door open & close 40 per Container
Container Outer Inspection & Monitoring 40 per Container
Extender Fitting on F/Rack Container 250 per Container
Re-arranging charge ( export) 23 per freight Ton
Re-arranging charge ( Import ) 25 per freight Ton
Vehicle Lashing on special stand 700 per stand
CFS palletising charge 75 per pallet
514.6 LASHING OF CARGO IN CONTAINERS
  Lashing of Cargo in Containers 20'- Charges in AED 40'- Charges in AED
a) Lashing of Cargo in Dry Container 115 145
b) Lashing of Cargo in flats & flat rack Containers 140 190

Back to top

515 MONITORING OF REFRIGERATED CONTAINERS

For monitoring of refrigerated Containers - AED 150 per 24 hours or part thereof will apply. This charge is in addition to the applicable THC and the storage.

Note: This charge covers extra work such as plug/unplug and monitoring of the temperature. No maintenance will be performed on malfunctioning reefers. The Port Operator will notify the Cargo.s agent and report malfunctions as soon as discovered. The Port Operator will not assume responsibility for power failure. The Port Operator will perform reefer repairs to machinery on request at an additional cost.

Back to top

516 DELAYS TO CRANE

After the first 30 (thirty) minutes - AED 1,450 (charge per hour or part thereof) will apply.

Back to top

517 CANCELLATION/POSTPONEMENT OF BERTHING

When it is desired to cancel or postpone berthing, advance notice of 24 (twenty-four) hours shall be given to the Port Operator, otherwise the Port Operator reserves the right to invoke Item 516 against the master, Vessel's owner or agent.

Back to top

518 CLEANING CONTAINERS
  Service 20"- Charges in AED 40"- Charges in AED
518.1 Cleaning 75 110
518.2 Removal of Placards per Container / Applying of placards per Container / Cost of each placard 40 40

Back to top

519 KNOCKING DOWN FLAT RACKS

Knocking down flat racks per unit - AED 65

Note: All empty flat racks delivered to Port should be in “knocked down” position. Else Port Operator shall knock down prior to receiving and raise the charges to consignee / agent.

Back to top

520 FITTING AND OR REMOVING TARPAULINS
  20" - Charges in AED 40" - Charges in AED
520.1 110 215

Back to top

521  ADMINISTRATIVE CHARGES AND THEIR OPERATIONAL REQUIREMENT
  Administrative Service Charges in AED
521.1 a) Change of designation Import to Export, Transhipment & Empty or vice versa 75
b) Mis-declaration or change in Port of Discharge
521.2 Shut outs at shipside or already moved 180
521.3 Interchange between Lines 110
521.4 Computer data amendment at Agents request 35
521.5 Empty Container monitoring at the gate 15
521.6 Administration of seals 15
521.7 Outbound Carrier Transhipment
a) Non - declaration of outward carrier 75
b) Change in outward carrier (If full list is transferred from one Vessel to the other AED 75 shall apply on the entire list irrespective of the number of Containers) 75
521.8 Outbound Carrier Export
a) Non or Mis-declaration of outward carrier 75
b) Change in outward carrier (If full list is transferred from one Vessel to the other AED 75 shall apply on the entire list irrespective of the number of Containers) 75
521.9 Include Containers in load list after cut off time of the Vessel Additional handling will be charged as per item 501
521.10 Photograph Charges 20 per photograph

Back to top

522  UNDELIVERED CONTAINERS – AUCTION/DISPOSAL

Containers containing goods destined for public auction/disposal as per section B item 225 will only be released after all shifting and unstuffing charges as per items 506, 512 and storage charges (calculated at AED 25 per day per Container from end of free storage period) have been received by the Port Operator. These charges will be to the respective shipping line's account.

Back to top

523 BUNDLING OF EMPTY FLATS/FLAT RACKS
  20'- Charges in AED 40'- Charges in AED
Two empty flats/flat racks lashing in one unit 550 775
Three empty flats/flat racks lashing in one 610 830
Four empty flats/flat racks lashing in one unit 665 940

Note: For all units loaded as bundles, THC will be charged per unit.

Back to top

524 CONTAINER MAINTENANCE CHARGES
    Up to 20’ Container - Charges in AED Up to 40’ Container - Charges in AED
a) Labour hourly rates for reefer Container repair or any other job
Note: If a technician needs to attend a complaint onboard a minimum of two hours will be charged
100 per man hour 100 per man hour
b) High pressure water wash 75 per Container 110 per Container
c) Steam cleaning 90 per Container 135 per Container
d) Chemical cleaning 135 per Container 200 per Container
e) Pre-Trip inspection and washing 280 per Container 315 per Container
f) To clean refrigeration units and condenser with high pressure water wash 40 per Container 40 per Container
g) Reefer Data Download/Upload 100 per Container 100 per Container
h) Genset Hook-up/Unhook 100 per Container 100 per Container

Note: Any other services provided will be charged as per the Port Operator's Tariff.

Back to top

525 CANCELLATION OF LABOUR
Cancellation of order shall be submitted in writing to General Cargo Office of respective terminal.
525.1
If Port labour and stevedoring gangs are cancelled after ordering, a cancellation fee of AED 135 per gang shall be applied.
525.2
If Port labour and stevedoring gangs are cancelled after reporting/operation starting time, in addition to the cancellation charge of AED 270 per gang, a charge as per Item No. 238 shall also apply. Overtime will be charged in addition if applicable.
525.3
When order is revised a charge of AED 135 per revision shall be applied at the discretion of the Port Operator.

Back to top

526 OPENING AND CLOSING OF HATCHES
Opening and closing of hatches is the responsibility of the Vessel. If the Port Operator carries out the operation, charges will be at AED 350 per hatch. Upper Twin Deck and Lower Twin Deck to be counted as separate operations. All productivity time lost during these operations will be charged as per item 239.

Back to top

527 TRANSHIPMENT CARGO
Cargo transhipped including ship to ship via quay or double banking will be charged at AED 15 per ton for discharge, and AED 15 per Ton for loading, except bagged Cargo which will be at the normal Tariff rate.

Back to top

528 SHIFTING CARGO ONBOARD (RE-STOW)
528.1
Shifting Cargo onboard within hatch shall be charged at normal Tariff rate. No Port handling charge shall be raised.
528.2
Shifting Cargo onboard from one hatch to another hatch without landing on quay shall be charged at normal Tariff rate plus 50%. No Port handling charge shall be raised.
528.3
Shifting Cargo onboard from one hatch to another hatch via quay shall be charged as per Item 527. Port handling charge shall be collected as per item 403.

Note: In case the tonnage of shifted Cargo is not available, then the physical measurement will be taken and the charges shall be as per Item No 407.

Back to top

529 RIGGING DERRICKS
Ship crew is responsible for rigging derricks, opening and closing hatches or any other gear. Time lost during such operation, shall be charged as per item 238.

Back to top

530 CARGO SORTING
The Cargo shall be discharged on „as is where-is basis.. In case Cargo sorting is required on board the Vessel, AED 40 per Ton will be applicable. Said charges will be applied to complete tonnage of mark involved (As per manifest/Bill of Lading) and not to the amount of tonnage sorted.

Back to top

531 LOCKER/DEEP TANK AND CABIN CARGO

Any Cargo discharged/loaded from/to lockers, deep tanks, Vessels accommodation or any other space not recognized as a genuine Cargo hatch then a surcharge of AED 8 per Ton will apply in addition to the normal Tariff rate.

Said surcharge shall also apply in regard to Cargo loaded/discharged from hatch tunnels, alleyways, long ends or deep wings. The decision of whether or not a hatch has long ends or wings will be at the Port Operator's discretion.

Back to top

532 TIMBER - PLYWOOD
  Packaging Charges in AED
532.1 In bundles and crates 17 per Freight Ton
532.2 Loose 20 per Freight Ton

Back to top

533 BAGGED CARGO
  Packaging Charges in AED
533.1 Bran, Soya bean meal, Animal Feed and Bags weighing less than 25 kg each 21 per Metric Tonne. Weighing less than 25 kg each
533.2 Cement, Brytes, Mud, Asbestos & all other Cargo (Jumbo Bags) 20 per Metric Tonne
533.3 Any other Bagged Cargo (Except hazardous) 18 per Metric Tonne

Back to top

534 HEAVY LIFT/AWKWARD LIFTS
    Charges in AED
534.1 Each unit 20 freight tons or more 15.5
534.2 Porta cabins/boats each unit 20 freight tons or more 15.5
534.3 For heavy lifts with a very high volume to weight ratio Rates are negotiable at the discretion of the Port Operator

Note: It is the agent‟s responsibility to provide suitable equipment or to bear the cost of shifting the heavy lift/awkward lift from under hook to the storage area.

Back to top

535 DANGEROUS CARGO
    Charges in AED
535.1 In Bags 40 AED per Metric Tonne
535.2 In Plastic Containers 40 per Freight Ton
535.3 Any other packing 28 per Freight Ton

Back to top

536 SCRAP
    Charges in AED
536.1 Steel, Iron and Copper 40 per Metric Tonne
536.2 Aluminium 40 per Freight Ton

Back to top

537 LIVE ANIMAL
    Charges in AED
537.1 Cow, Buffalo, Horse and Camel 11 per head
537.2 Goat and Sheep 3 per head

Back to top

538 STEEL
    Charges in AED
538.1 Steel Coils / Billets 16 per Metric Tonne
538.2 Steel Products (Angles, Plates, Flat Bars, etc) 18 per Freight Ton

Back to top

539 GENERAL CARGO
539.1
Not otherwise specified (NOS)                              AED 17 per Freight Ton.
539.2
Palletizing Cargo                                                   AED 3.00 per Freight Ton.
(Pallets remain the property of the Port Operator).

Back to top

540 RO-RO

To load or discharge self propelled wheeled and tracked unit(s) from quay side to Vessel or vice versa.

540.1 Self Propelled Unit

    Charges in AED
a) Upto 3 metric Tons 50 per Unit
b) Above 3 and upto 10 metric Tons 65 per Unit
c) Above 10 and up to 50 metric Tons 160 per Unit
d) Above 50 and up to 70 metric Tons 665 per Unit
e) Above 70 metric Tons (on empty) 15 per Metric Tonne
540.2 Tracked Unit - (Including Ships Empty Unit)
    Charges in AED
a) Up to 5 metric Tons 44 per Unit
b) Above 5 and up to 50 metric Tons 95 per Unit
c) Above 50 metric Tons At Port Operator's Discretion

Note:

  1. Any Cargo loaded/discharged by any method other than RO-RO, rates under Item No. 534 & 539 shall apply.
  2. Any Cargo loaded on vehicles will be charged individually at appropriate Stevedoring rates.

Back to top

541 BULK
541.1 Crushed (Powdered)
    Charges in AED
a) With mechanical grab and mechanical shovel in hatch. 7 per Metric Tonne
b) With bucket and mechanical shovel in the hatch 7 per Metric Tonne
c) With bucket and hand shovel or any other gears to be used manually 18 per Metric Tonne
541.2 Uncrushed (Stones)
    Charges in AED
a) With mechanical grab and mechanical shovel in hatch. 9 per Metric Tonne
b) With bucket and mechanical shovel in the hatch 15 per Metric Tonne
c) With bucket and spade shovel or any other gears used manually 20 per Metric Tonne
541.3 Grains, Cement, etc.
  1. If Discharged by Suction system - N/A
  2. By any other method rate under Item No. 541.1 a) & b) shall apply.

 

541.4 Bulk Liquid through Pipelines N/A

Note: If the Vessel is not a Bulk Carrier (i.e., Vessel with Twin Deck) additional AED 2.00 per Tonne will apply.

Back to top

542 REEFER
Chilled / Reefer Cargo - AED 33.00 per Metric Tonne.

Back to top

543 DISTRESSED CARGO
Cargo that has been subjected to fire, water, shifting or other influences that will cause the Cargo to be handled in other than the normal efficient manner, shall be subject to special rates.

Back to top

544 STEVEDORING RELATED TARIFF (Effective 1st May 2012)
 
Trailer - Charges in AED per hour or thereafter 3 Ton pickup - Charges in AED per hour or thereafter
544 Internal Shifting of cargo from one berth / quay to another
700 200

Back to top

To view other Tariff sections please click on any of the following links

A Definitions
B Conditions, Rules and Regulations
C Marine Related Tariff
D Operations Related Tariff
E Stevedoring Related Tariff
F Automobiles & Related Tariff
G Miscellaneous Items Tariff
H Third Party Related Tariff

To view full tariff in PDF format, please click here

Back to top